Saab 9-5

since 1997 of release

Repair and car operation



Saab 9-5
+ Saab 9-5 Cars
+ Governing bodies and operation receptions
+ Settings and routine maintenance of the car
+ Engine
+ Systems of cooling of the engine, heating, ventilation and air conditioning
+ the Power supply system and production of the fulfilled gases
- Systems of electric equipment of the engine
   + Systems of ignition, preheat and engine management
   + Diagnostics of systems of electronic control and diagnostic equipment
   - Charge and start systems
      General information
      The storage battery - the general information, recommendations about service
      Charge system - general information and security measures
      Removal and generator installation
      Replacement of the block of the rectifier of tension and generator brushes
      System of start of the engine - the general information and precautionary measures
      Removal and starter installation
+ Manual box of gear shifting
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment



Removal and starter installation

4-cylinder engines

 PERFORMANCE ORDER

  1. Disconnect a negative wire from the storage battery and remove the top casing of the inlet pipeline.
  1. Turn out the top bolt of a starter (3 on an illustration) and disconnect from it electroconducting (4).
  1. To Poddomkratta the car also cut a bandage tape (6) traction relays. Turn out the bottom nut (7) and remove a starter.
  2. Installation is made upside-down.

Petrol V6 engines

 PERFORMANCE ORDER

  1. Remove the generator (see. The section Removal and generator installation) also disconnect electroconducting from a starter (3 on an illustration).
  1. Turn out the top bolt of fastening of a starter (4).

It is more convenient to make all this through the right wheel arch by means of the key extension piece.

  1. Turn out the bottom bolt (5) and remove a starter (6).
  2. Installation is made upside-down.

Diesel engine

 PERFORMANCE ORDER

  1. Remove the bottom support of the engine (see. Head Engine).
  1. Disconnect generator electroconducting (2 on an illustration) and a starter (3).
  1. Give fixture (4) starters and, having removed the engine from a stretcher by means of a wedge established between them, remove a starter.
  2. Installation is made upside-down.