Saab 9-5

since 1997 of release

Repair and car operation



Saab 9-5
+ Saab 9-5 Cars
+ Governing bodies and operation receptions
+ Settings and routine maintenance of the car
+ Engine
- Systems of cooling of the engine, heating, ventilation and air conditioning
   - System of cooling of the engine
      General information and precautionary measures
      Removal and installation of the water pump
      Removal and thermostat installation
      Removal and installation of assembly of fans of a radiator
      Fan replacement
      Removal and radiator installation
      Removal and installation of a maslookhladitel of 4-cylinder petrol engines
      Removal and installation of a broad tank
   + Systems of heating, ventilation and air conditioning
+ the Power supply system and production of the fulfilled gases
+ Systems of electric equipment of the engine
+ Manual box of gear shifting
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment



Removal and installation of a broad tank

Below the description for petrol models is provided.


 PERFORMANCE ORDER

  1. Dump pressure in system of cooling and remove the storage battery.
  2. Remove an arm of a broad tank from a suspension bracket rack.
  1. Shift a broad tank forward and separate the socket of the sensor of level of OZh (6 on an illustration).
  1. Remove the holder (7 on an illustration) a plait of electroconducting of the block of the relay from the battery pallet
  2. Raise a broad tank and extend the bottom hose between a plait of electroconducting and the battery pallet.
  3. Press hoses at a broad tank, shift it forward and pour out its contents in suitable capacity.
  4. Disconnect from a broad tank all hoses and remove it.
  5. Installation is made in return sequence.