Saab 9-5 + Saab 9-5 Cars + Governing bodies and operation receptions + Settings and routine maintenance of the car + Engine - Systems of cooling of the engine, heating, ventilation and air conditioning + System of cooling of the engine - Systems of heating, ventilation and air conditioning General information Removal and control unit installation by ventilation system with a heater and To/in, removal and installation of the broad valve Replacement of the valve of an otsechka of cooling liquid and it Ý/m the valve Removal and installation of the fan of a heater Removal and heat exchanger installation Removal, repair and To/in compressor installation Removal and installation of the sensor of temperature in salon Removal and installation of the step-by-step engine of a zaslonka of mixing of air and э / motor of a zaslonka of a mode of air circulation + the Power supply system and production of the fulfilled gases + Systems of electric equipment of the engine + Manual box of gear shifting + Automatic transmission + Coupling and power shafts + Brake system + Suspension bracket and steering + Body + Onboard electric equipment
|
Replacement of the valve of an otsechka of cooling liquid and it Ý/m the valve
|
These valves are riveted with each other. |
|
- Uncover a broad tank and dump pressure in system. Substitute under the car capacity for collecting OZh.
|
- Press water hoses (3 on an illustration) and disconnect from valves vacuum hoses (4).
|
|
Check at the same time a condition of hoses. |
- Separate the socket (5 on an illustration) Ý/m the valve and cut the cable coupler (6) holding together Ý/m the valve and electroconducting.
|
- Remove collars (7 on an illustration) fastenings of hoses to Ý/m to the valve and drill rivets (9).
|
- Replace the valve of an otsechka or it Ý/m the valve.
- Installation is made upside-down. Instead of rivets use boltovy connection.
|
|
|
|