Saab 9-5

since 1997 of release

Repair and car operation



Saab 9-5
+ Saab 9-5 Cars
+ Governing bodies and operation receptions
+ Settings and routine maintenance of the car
+ Engine
- Systems of cooling of the engine, heating, ventilation and air conditioning
   + System of cooling of the engine
   - Systems of heating, ventilation and air conditioning
      General information
      Removal and control unit installation by ventilation system with a heater and To/in, removal and installation of the broad valve
      Replacement of the valve of an otsechka of cooling liquid and it Ý/m the valve
      Removal and installation of the fan of a heater
      Removal and heat exchanger installation
      Removal, repair and To/in compressor installation
      Removal and installation of the sensor of temperature in salon
      Removal and installation of the step-by-step engine of a zaslonka of mixing of air and э / motor of a zaslonka of a mode of air circulation
+ the Power supply system and production of the fulfilled gases
+ Systems of electric equipment of the engine
+ Manual box of gear shifting
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment



Replacement of the valve of an otsechka of cooling liquid and it Ý/m the valve

These valves are riveted with each other.


 PERFORMANCE ORDER

  1. Uncover a broad tank and dump pressure in system. Substitute under the car capacity for collecting OZh.
  1. Press water hoses (3 on an illustration) and disconnect from valves vacuum hoses (4).

Check at the same time a condition of hoses.

  1. Separate the socket (5 on an illustration) Ý/m the valve and cut the cable coupler (6) holding together Ý/m the valve and electroconducting.
  1. Remove collars (7 on an illustration) fastenings of hoses to Ý/m to the valve and drill rivets (9).
  1. Replace the valve of an otsechka or it Ý/m the valve.
  2. Installation is made upside-down. Instead of rivets use boltovy connection.