Saab 9-5

since 1997 of release

Repair and car operation



Saab 9-5
+ Saab 9-5 Cars
+ Governing bodies and operation receptions
+ Settings and routine maintenance of the car
+ Engine
- Systems of cooling of the engine, heating, ventilation and air conditioning
   + System of cooling of the engine
   - Systems of heating, ventilation and air conditioning
      General information
      Removal and control unit installation by ventilation system with a heater and To/in, removal and installation of the broad valve
      Replacement of the valve of an otsechka of cooling liquid and it Ý/m the valve
      Removal and installation of the fan of a heater
      Removal and heat exchanger installation
      Removal, repair and To/in compressor installation
      Removal and installation of the sensor of temperature in salon
      Removal and installation of the step-by-step engine of a zaslonka of mixing of air and э / motor of a zaslonka of a mode of air circulation
+ the Power supply system and production of the fulfilled gases
+ Systems of electric equipment of the engine
+ Manual box of gear shifting
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment



Removal and heat exchanger installation

 PERFORMANCE ORDER

  1. Disconnect from the engine heat exchanger hoses.
  2. Submit through an opening in a head of cylinders the compressed air to empty the heat exchanger.
Purge of liquid of the heat exchanger of 4-cylinder petrol engines.
Purge of liquid of the heat exchanger of petrol V6 engines.
  1. Remove the main ware box and a lateral part of furnish of the central console of the dashboard.
  1. Remove from an air line the gate.

Do not remove an epiploon.


  1. Separate the socket of tubes of the heat exchanger.
  1. Turn out 4 bolts and remove the heat exchanger.
  2. Installation is made upside-down. Use new consolidations.