Saab 9-5 + Saab 9-5 Cars + Governing bodies and operation receptions + Settings and routine maintenance of the car + Engine - Systems of cooling of the engine, heating, ventilation and air conditioning + System of cooling of the engine - Systems of heating, ventilation and air conditioning General information Removal and control unit installation by ventilation system with a heater and To/in, removal and installation of the broad valve Replacement of the valve of an otsechka of cooling liquid and it Ý/m the valve Removal and installation of the fan of a heater Removal and heat exchanger installation Removal, repair and To/in compressor installation Removal and installation of the sensor of temperature in salon Removal and installation of the step-by-step engine of a zaslonka of mixing of air and э / motor of a zaslonka of a mode of air circulation + the Power supply system and production of the fulfilled gases + Systems of electric equipment of the engine + Manual box of gear shifting + Automatic transmission + Coupling and power shafts + Brake system + Suspension bracket and steering + Body + Onboard electric equipment
|
Removal and heat exchanger installation
|
- Disconnect from the engine heat exchanger hoses.
- Submit through an opening in a head of cylinders the compressed air to empty the heat exchanger.
|
Purge of liquid of the heat exchanger of 4-cylinder petrol engines. |
|
Purge of liquid of the heat exchanger of petrol V6 engines. |
- Remove the main ware box and a lateral part of furnish of the central console of the dashboard.
|
- Remove from an air line the gate.
|
|
Do not remove an epiploon. |
|
- Separate the socket of tubes of the heat exchanger.
|
- Turn out 4 bolts and remove the heat exchanger.
- Installation is made upside-down. Use new consolidations.
|
|
|
|