Saab 9-5

since 1997 of release

Repair and car operation



Saab 9-5
+ Saab 9-5 Cars
+ Governing bodies and operation receptions
+ Settings and routine maintenance of the car
+ Engine
- Systems of cooling of the engine, heating, ventilation and air conditioning
   + System of cooling of the engine
   - Systems of heating, ventilation and air conditioning
      General information
      Removal and control unit installation by ventilation system with a heater and To/in, removal and installation of the broad valve
      Replacement of the valve of an otsechka of cooling liquid and it Ý/m the valve
      Removal and installation of the fan of a heater
      Removal and heat exchanger installation
      Removal, repair and To/in compressor installation
      Removal and installation of the sensor of temperature in salon
      Removal and installation of the step-by-step engine of a zaslonka of mixing of air and э / motor of a zaslonka of a mode of air circulation
+ the Power supply system and production of the fulfilled gases
+ Systems of electric equipment of the engine
+ Manual box of gear shifting
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment



Removal and installation of the step-by-step engine of a zaslonka of mixing of air and э / motor of a zaslonka of a mode of air circulation

 PERFORMANCE ORDER

  1. Remove a ware box and the right lateral panel of furnish of the central console.
  1. Separate the socket, turn out 2 bolts and remove the step-by-step engine.
  1. Turn out two bolts (2 on an illustration) and separate the socket (3) э / the motor.
  1. Cut an electroconducting coupler (4 on an illustration) and remove the socket from an arm (5).