Saab 9-5

since 1997 of release

Repair and car operation



Saab 9-5
+ Saab 9-5 Cars
+ Governing bodies and operation receptions
+ Settings and routine maintenance of the car
+ Engine
+ Systems of cooling of the engine, heating, ventilation and air conditioning
- Power supply system and production of the fulfilled gases
   General information and security measures
   Sbrasyvaniye of pressure in fuel system
   + Power supply system of petrol engines
   + Power supply system of the diesel V6 engine
   - Systems of release and decrease in toxicity of the fulfilled gases
      General information
      Removal and installation of components of system of release of OG
      Removal and installation lambda probes
      Removal and installation of components of SAI system
      Removal and installation of components of EVAP system
      Removal and installation of the valve and EGR system tube
+ Systems of electric equipment of the engine
+ Manual box of gear shifting
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment



Removal and installation of the valve and EGR system tube

 PERFORMANCE ORDER

  1. Remove the top section of the inlet pipeline and the fuel distributive highway with fuel tubes (see. Section Removal and installation of the inlet pipeline).
  1. Remove assembly the EGR valve with a tube of EGR and a turbokompressor tube.
  1. Disconnect water hoses (8 on an illustration) and separate the EGR (9) valve from assembly removals.
  1. Installation is made upside-down. Use new consolidations of understanding connections.