Saab 9-5

since 1997 of release

Repair and car operation



Saab 9-5
+ Saab 9-5 Cars
+ Governing bodies and operation receptions
+ Settings and routine maintenance of the car
+ Engine
+ Systems of cooling of the engine, heating, ventilation and air conditioning
+ the Power supply system and production of the fulfilled gases
+ Systems of electric equipment of the engine
+ Manual box of gear shifting
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
- Body
   - External equipment and body elements
      Removal and installation of bumpers
      Removal and installation decorative radiator reshyotok
      Removal and installation of spoilers
      Removal and installation of a covering and decorative panel of a trunk lid
      Removal and installation of loker of wheel arches
      Removal and installation of forward wings and windscreen fairing
      Removal and installation of beams of the top luggage carrier of the Versatile person models
      Removal and installation of assembly of the top hatch and its components
      Removal and installation of a cowl and its lock
      Removal, installation, dismantling and assembly of a forward door and its components
      Removal, installation, dismantling and assembly of a back door and its components
      Removal, dismantling, assembly and installation of a door of a back and its components
      Removal and installation of a trunk lid and its components
      The fixed glasses
   + salon Equipment
+ Onboard electric equipment



Removal, dismantling, assembly and installation of a door of a back and its components

Removal, installation and door adjustment

 PERFORMANCE ORDER

  1. Open a door of a back and remove casings from its loops.
  1. Remove the top cover of glass, a covering of a rack of D and a ceiling, holders of a grid for fixing of cargoes, and also clamps and covers between racks of C and D.
  1. Start up a covering of a ceiling a little and separate sockets of electroconducting and a tube of a stekloomyvatel (5). On both parties open cable channels (6) and remove them from electroconducting plaits.
  1. Deduce electroconducting through loops (7), ask the assistant to hold a door and turn out 4 bolts of its (9) fastenings to loops.
  1. Remove a door from loops.
  2. Installation is made upside-down. After installation adjust the provision of a door concerning a body.
  3. Adjustment of provision of a door in to the left-to the right and is made at the released bolts (9) fastenings of a door to loops forward-back. For adjustment of provision of a door up-down execute the actions described below.
  1. Remove a lateral emphasis, consolidation and doorway furnish.
  1. Remove the components specified in paragraph 2 and slightly lower a ceiling covering.
  1. Adjust the provision of a door, having released on 3 bolts on each loop (8).
  1. Tighten bolts and establish acting in film components.

Internal handle and door covering

 PERFORMANCE ORDER

  1. Open a back door.
  1. Remove a frame (2) round the internal handle, having unbent it a screw-driver in three 3 cuts, and having pulled down at the released clamps.
  1. Liberate a door covering from clamps (3).
  1. Remove a covering. For this purpose at first pull down to it the top part, and then pull back.
  1. Remove two drafts of the lock (5), turn out screws (6), shift the handle aside and remove it (7).

Lock and lock cylinder

 PERFORMANCE ORDER

  1. For removal of the cylinder of the lock give nuts, unhook draft (5) and separate the socket.
  1. For removal of the lock disconnect 3 drafts (5), turn out 4 bolts (6) and separate the socket (7).

External handle

 PERFORMANCE ORDER

  1. Turn out screws outside of a door.
  1. Remove both back combined a lamp and a plate of registration plate (6).
  1. Turn out nuts (7), remove draft and separate the socket (7).
  1. Liberate clamps and remove the lock together with illumination of registration plate.