Saab 9-5

since 1997 of release

Repair and car operation



Saab 9-5
+ Saab 9-5 Cars
+ Governing bodies and operation receptions
+ Settings and routine maintenance of the car
+ Engine
+ Systems of cooling of the engine, heating, ventilation and air conditioning
- Power supply system and production of the fulfilled gases
   General information and security measures
   Sbrasyvaniye of pressure in fuel system
   + Power supply system of petrol engines
   - Power supply system of the diesel V6 engine
      General information
      Removal and installation of a sleeve of an air inlet, case of the air filter and MAF sensor
      Removal and installation of the inlet pipeline
      Replacement of the sensor of provision of a pedal of gas
      Replacement of sensors of a turbo-supercharging and sensor of temperature of fuel
      Replacement of the valve of management with pressure of pressurization
      Removal and turbokompressor installation
      Removal and installation of an interkuler
      Removal and installation of a fuel tank
      Replacement of the fuel filter
      Removal and installation of the fuel distributive highway
      Removal and installation of the sensor of a stock of fuel
      Removal and TNVD installation and replacement of its epiploon
      Removal and installation of nozzles
   + Systems of release and decrease in toxicity of the fulfilled gases
+ Systems of electric equipment of the engine
+ Manual box of gear shifting
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment



Removal and installation of nozzles

 PERFORMANCE ORDER

  1. Remove the top section of the inlet pipeline (see. Section Removal and installation of the inlet pipeline).
  2. Separate sockets of nozzles, ECT sensors, pressure of pressurization, CKP, the vacuum tank of a turbokompressor and the EGR valve. Remove cable channels from covers of heads of cylinders.
  3. Remove the holder of electroconducting from a back head of cylinders and a generator arm.
  4. Remove the electroconducting fixed on submitting and returnable fuel lines.
  5. Remove tubes of nozzles (see an illustration).
  1. Remove returnable fuel lines together with arms from a back row of cylinders and take them aside.
  1. Remove a forward water tube from the inlet pipeline and a head of cylinders (10 on an illustration).
  1. Remove from a cover of a head of cylinders a hose of ventilation of a case (11 on an illustration) and remove covers of heads of cylinders (12).
  1. Remove holders of nozzles (13 on an illustration), and then returnable fuel lines with nozzles (14).
  1. Installation is made upside-down. Use new consolidations of understanding connections.