- Remove the top section of the inlet pipeline (see. Section Removal and installation of the inlet pipeline).
- Separate sockets of nozzles, ECT sensors, pressure of pressurization, CKP, the vacuum tank of a turbokompressor and the EGR valve. Remove cable channels from covers of heads of cylinders.
- Remove the holder of electroconducting from a back head of cylinders and a generator arm.
- Remove the electroconducting fixed on submitting and returnable fuel lines.
- Remove tubes of nozzles (see an illustration).
|
- Remove returnable fuel lines together with arms from a back row of cylinders and take them aside.
|
|
- Remove a forward water tube from the inlet pipeline and a head of cylinders (10 on an illustration).
|
- Remove from a cover of a head of cylinders a hose of ventilation of a case (11 on an illustration) and remove covers of heads of cylinders (12).
|
- Remove holders of nozzles (13 on an illustration), and then returnable fuel lines with nozzles (14).
|
- Installation is made upside-down. Use new consolidations of understanding connections.
|
|