Saab 9-5

since 1997 of release

Repair and car operation



Saab 9-5
+ Saab 9-5 Cars
+ Governing bodies and operation receptions
+ Settings and routine maintenance of the car
+ Engine
+ Systems of cooling of the engine, heating, ventilation and air conditioning
- Power supply system and production of the fulfilled gases
   General information and security measures
   Sbrasyvaniye of pressure in fuel system
   - Power supply system of petrol engines
      Principle of functioning of a control system of fuel injection
      Removal and installation of a sleeve of an air inlet and case of the air filter
      Removal and installation of sensors MAF, MAP, IAT and sensor of temperature/pressure of air of pressurization
      Removal and installation of a tube of forced air
      Removal and installation of the case of a throttle
      Removal and installation of the control valve of forced air
      Removal and installation of the perepuskny valve of a turbokompressor
      Removal and turbokompressor installation
      Removal and installation of an interkuler
      Removal and installation of a pedal of gas, adjustment of a cable of a drive of a butterfly valve
      Removal and installation of a fuel tank
      Replacement of the fuel filter
      Removal and installation of assembly of the fuel pump and sensor of a stock of fuel
      Removal and installation of the fuel distributive highway and injectors
      Removal and installation of a regulator of pressure of fuel
   + Power supply system of the diesel V6 engine
   + Systems of release and decrease in toxicity of the fulfilled gases
+ Systems of electric equipment of the engine
+ Manual box of gear shifting
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment



Removal and installation of a pedal of gas, adjustment of a cable of a drive of a butterfly valve

Removal and pedal installation

 PERFORMANCE ORDER

  1. Open a cover of the diagnostic socket (1 on an illustration) and turn out bolts of its fastening (2).
  1. Turn out bolts and release a clamp of the bottom panel (3).
  1. Separate the socket of illumination of a threshold (4 on an illustration) and remove the bottom panel.
  1. Shift back the plug (6 on an illustration) and remove it together with a cable. Turn out nuts and remove a pedal (7).
  2. Installation is made upside-down.

Cable adjustment

 PERFORMANCE ORDER

  1. Uncover the engine and a cable clip.
  1. Adjust a free wheeling of a cable, holding one hand the pedal lever in completely loaded provision of a spring, and other hand pulling a cable.
  2. Having pulled a cable, establish it in the next groove.
  3. Establish a clip and an engine cover.