Saab 9-5

since 1997 of release

Repair and car operation



Saab 9-5
+ Saab 9-5 Cars
+ Governing bodies and operation receptions
+ Settings and routine maintenance of the car
- Engine
   General information and preparatory operations
   Check of kompressionny pressure
   Engine check by means of the vacuum gage
   - Repair of 4-cylinder petrol engines
      Reduction of the piston of the first cylinder in the provision of the top dead point (VMT)
      Removal and installation of a head of cylinders and natyazhitel of a driving chain
      Removal and installation of camshafts and valves, assessment of klapanny gaps
      Check and replacement of a driving chain
      Replacement of a belt of a drive of auxiliary units
      Replacement of epiploons and pulley of a cranked shaft
      Replacement of the oil pump
      Removal and installation of the pallet of a case
      Removal and installation of an arm of the filter, thermostat and reduktsionny valve of system of greasing of the engine
      Check of pressure of impellent oil
      Removal and installation of the power unit
      Removal and installation of a cover of a drive of GRM
      Check and replacement of a chain of a drive of balancing shaft and their asterisks
   + Repair of 6-cylinder petrol engines
   + Repair of 6-cylinder diesel engines
+ Systems of cooling of the engine, heating, ventilation and air conditioning
+ the Power supply system and production of the fulfilled gases
+ Systems of electric equipment of the engine
+ Manual box of gear shifting
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment



Check of pressure of impellent oil

 PERFORMANCE ORDER

  1. To Poddomkratta the car also establish it on props. Substitute under the oil filter capacity for collecting impellent oil.
  1. Give a hollow bolt of fastening of a tube of a turbokompressor to an arm of the oil filter (2 on an illustration) and let's to oil flow down.
  1. Establish under a hollow bolt a hose with a manometer and tighten a bolt. Arrange a manometer so that he was visible from a place of the driver.

Watch that the hose did not concern hot and sharp subjects.

  1. Lower the car on the earth, start the engine and consider manometer indications. Compare the obtained data with requirements of Specifications.
  2. After measurement let's to the engine work on single turns to reduce speed of a turbokompressor then muffle the engine.
  3. Installation is made upside-down. If necessary modify level of impellent oil.