Saab 9-5

since 1997 of release

Repair and car operation



Saab 9-5
+ Saab 9-5 Cars
+ Governing bodies and operation receptions
+ Settings and routine maintenance of the car
- Engine
   General information and preparatory operations
   Check of kompressionny pressure
   Engine check by means of the vacuum gage
   - Repair of 4-cylinder petrol engines
      Reduction of the piston of the first cylinder in the provision of the top dead point (VMT)
      Removal and installation of a head of cylinders and natyazhitel of a driving chain
      Removal and installation of camshafts and valves, assessment of klapanny gaps
      Check and replacement of a driving chain
      Replacement of a belt of a drive of auxiliary units
      Replacement of epiploons and pulley of a cranked shaft
      Replacement of the oil pump
      Removal and installation of the pallet of a case
      Removal and installation of an arm of the filter, thermostat and reduktsionny valve of system of greasing of the engine
      Check of pressure of impellent oil
      Removal and installation of the power unit
      Removal and installation of a cover of a drive of GRM
      Check and replacement of a chain of a drive of balancing shaft and their asterisks
   + Repair of 6-cylinder petrol engines
   + Repair of 6-cylinder diesel engines
+ Systems of cooling of the engine, heating, ventilation and air conditioning
+ the Power supply system and production of the fulfilled gases
+ Systems of electric equipment of the engine
+ Manual box of gear shifting
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment



Check and replacement of a driving chain

Check

 PERFORMANCE ORDER

  1. To Poddomkratta the car also establish it on props. Remove the bottom cover of a belt of a drive of auxiliary units.
  1. Lower the car on the earth and remove a decorative cover of the engine and a spark plug (see. Section Check and replacement of spark plugs and ignition module).
  2. Remove a hose and a tube of ventilation of a case. Cut off a cable coupler on the control valve. Separate the socket Ý/m the valve and uncover heads of cylinders.
  3. Establish the piston of the first cylinder in the provision VMT of the end of a step of compression (see. The section Reduction of the piston of the first cylinder in the provision of the top dead point (VMT)).
  4. Weaken a tension of a belt of a drive of auxiliary units and give an intermediate gear wheel so that to release the coupling of a natyazhitel of a chain.
  5. Turn out a stopper of a natyazhitel, remove a spring and a pusher then remove a natyazhitel, without changing position of pistons.
  1. The acting part of a natyazhitel should not exceed 15 mm, otherwise it is necessary to replace a chain.
  1. Check wear of asterisks and directing to a chain. If on a surface between external edges of the directing there are wear signs, replace natyazhitel together with a chain.

Replacement

 PERFORMANCE ORDER

  1. Cover area round a chain on asterisks of camshafts rags and fix a chain plastic collars. Break off a chain, having removed by means of the special adaptation a folding link. Fix a plastic collar on the end of an old chain.
  1. Connect a new chain to the old.

Do not allow chain falling. Make sure that the new chain lies on an asterisk of an inlet camshaft.


  1. Establish on a chain holding adaptation and clean rags and collars from asterisks.
  1. Ask the assistant to turn a cranked shaft (clockwise) and, holding an old chain, stack a new chain on asterisks of a cranked shaft.

Hold an old chain intense that it did not develop on cranked to a shaft.


  1. When the new chain will be established on asterisks so that on an asterisk of an inlet camshaft there will be only a few links, again lay round it rags. Fix a new chain a collar, remove a folding link and disconnect an old chain.
  1. Connect a new chain a connecting link, clean a collar and rags and stretch a chain so that this link rose on the center of the holding adaptation.
  2. Condense an opening with rags, remove a connecting link and put the new lock of a chain. Check that the insert with number 2 is in the special adaptation, then place in it a plate of a connecting link and establish it on a link in a chain, having pressed with effort of 10 N • m.
  3. Turn an insert in the special adaptation and place it V-shaped dredging directly on one of shenkely on a link. Rivet шенкель with effort of 15 N • m. Then repeat this operation on other шенкеле.
  4. Check diameter compressed together the shenkely – it should make 3.4 - 3.6 mm.
  5. Remove rags and holding adaptation.
  6. Further installation is made upside-down. Tighten fixture with demanded efforts. Use a new sealing ring of a natyazhitel of a chain.