Saab 9-5

since 1997 of release

Repair and car operation



Saab 9-5
+ Saab 9-5 Cars
+ Governing bodies and operation receptions
+ Settings and routine maintenance of the car
- Engine
   General information and preparatory operations
   Check of kompressionny pressure
   Engine check by means of the vacuum gage
   - Repair of 4-cylinder petrol engines
      Reduction of the piston of the first cylinder in the provision of the top dead point (VMT)
      Removal and installation of a head of cylinders and natyazhitel of a driving chain
      Removal and installation of camshafts and valves, assessment of klapanny gaps
      Check and replacement of a driving chain
      Replacement of a belt of a drive of auxiliary units
      Replacement of epiploons and pulley of a cranked shaft
      Replacement of the oil pump
      Removal and installation of the pallet of a case
      Removal and installation of an arm of the filter, thermostat and reduktsionny valve of system of greasing of the engine
      Check of pressure of impellent oil
      Removal and installation of the power unit
      Removal and installation of a cover of a drive of GRM
      Check and replacement of a chain of a drive of balancing shaft and their asterisks
   + Repair of 6-cylinder petrol engines
   + Repair of 6-cylinder diesel engines
+ Systems of cooling of the engine, heating, ventilation and air conditioning
+ the Power supply system and production of the fulfilled gases
+ Systems of electric equipment of the engine
+ Manual box of gear shifting
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment



Replacement of epiploons and pulley of a cranked shaft

Forward epiploon

 PERFORMANCE ORDER

  1. To Poddomkratta the car also establish it on props. Remove the right forward wheel.
  2. Remove a belt of a drive of auxiliary units (see. Section Replacement of a belt of a drive of auxiliary units).
  1. Remove the bottom cover of a flywheel and block flywheel rotation by means of the special adaptation.
  1. Turn out a bolt of fastening of a pulley of a cranked shaft (6) and accurately take a screw-driver an old epiploon (7).

Do not damage the surface of the oil pump interfaced to an epiploon.

  1. Establish a new epiploon by means of the special adaptation or a piece of a pipe of suitable diameter.
  2. Further installation is made as it should be, the return sequence of dismantle of components. In end start the engine, let's to it work idling. Muffle the engine and check existence of leaks through an epiploon.

Back epiploon

 PERFORMANCE ORDER

  1. Remove RKPP or AT, depending on model (see. Head Manual box of gear shifting or Automatic transmission). On models from RKPP remove coupling and a persistent plate (see. Head Coupling and power shafts).
  2. Remove a flywheel or a driving disk.
  3. Accurately take a screw-driver an old epiploon.

Do not damage a surface interfaced to an epiploon.


  1. Press a new epiploon by means of the special adaptation (1 on an illustration), established on cranked to a shaft.
  1. Installation is made upside-down. Tighten fixture with demanded efforts.