Saab 9-5

since 1997 of release

Repair and car operation



Saab 9-5
+ Saab 9-5 Cars
+ Governing bodies and operation receptions
+ Settings and routine maintenance of the car
- Engine
   General information and preparatory operations
   Check of kompressionny pressure
   Engine check by means of the vacuum gage
   - Repair of 4-cylinder petrol engines
      Reduction of the piston of the first cylinder in the provision of the top dead point (VMT)
      Removal and installation of a head of cylinders and natyazhitel of a driving chain
      Removal and installation of camshafts and valves, assessment of klapanny gaps
      Check and replacement of a driving chain
      Replacement of a belt of a drive of auxiliary units
      Replacement of epiploons and pulley of a cranked shaft
      Replacement of the oil pump
      Removal and installation of the pallet of a case
      Removal and installation of an arm of the filter, thermostat and reduktsionny valve of system of greasing of the engine
      Check of pressure of impellent oil
      Removal and installation of the power unit
      Removal and installation of a cover of a drive of GRM
      Check and replacement of a chain of a drive of balancing shaft and their asterisks
   + Repair of 6-cylinder petrol engines
   + Repair of 6-cylinder diesel engines
+ Systems of cooling of the engine, heating, ventilation and air conditioning
+ the Power supply system and production of the fulfilled gases
+ Systems of electric equipment of the engine
+ Manual box of gear shifting
+ Automatic transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment



Replacement of a belt of a drive of auxiliary units

Check of a condition and tension of a belt of a drive of auxiliary units is described in the Section Check of a condition and a tension of a belt of a drive of auxiliary units.

Removal of components in the right part of an impellent compartment

2 — GUR Tube
3 — the Wedge
4 — the Right support of the engine

5 — the MAF Sensor
6 — the Right support of the engine
7 — the Elevating eye of the engine


 PERFORMANCE ORDER

  1. Uncover the inlet pipeline.
  2. To Poddomkratta the car also establish it on props and turn the right forward wheel outside then lift the receiver the pump GUR from a frame (2 on an illustration).
  3. Establish a wedge between the pallet of a case and a frame (3 on an illustration).
  4. Remove a rubber saddle of the MAF sensor (5 on an illustration) and take him aside.
  5. Remove the right support (4 on an illustration) the engine together with a collar.
  6. Unload a natyazhitel of a belt and fix it in this situation, having inserted into its opening a prutkovy key (3 mm).
  7. Remove a driving belt from pulleys.
  8. Installation is made upside-down.